Slug-Lines.com Homepage
Forum Home Forum Home > General Slugging Questions and Comments > General Slugging Topics
  New Posts New Posts RSS Feed - New Route 630 interchange rendering shown
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

New Route 630 interchange rendering shown

 Post Reply Post Reply
Author
Message
USA View Drop Down
New Slug
New Slug


Joined: 06 Jun 2002
Status: Offline
Points: 0
Post Options Post Options   Thanks (0) Thanks(0)   Quote USA Quote  Post ReplyReply Direct Link To This Post Topic: New Route 630 interchange rendering shown
    Posted: 08 Dec 2012 at 10:38pm
I'm not aware of a way to insert an image on this forum, so here's a link to the image of what the Route 630 interchange is to look like when it's rebuilt. Note there will be TWO commuter lots. Current plan is for the project to be advertised for bids in 2016 and for construction to take three years.

http://cdn.blogs.fredericksburg.com/newsdesk/files/2012/11/Rendering-1_1071final.jpg


Here's a link to the article that goes with that image:

http://news.fredericksburg.com/newsdesk/2012/11/30/new-stafford-courthouse-interchange-plans-unveiled/
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 11.10
Copyright ©2001-2017 Web Wiz Ltd.

This page was generated in 0.078 seconds.